2.2 Continuing off-track trend over repeated quarters

FRV: Percentage of response to structure fire incidents within 7.7 minutes (target 90%)

FRV’s result for this measure in Q1 in 2025–26 represents the 20th consecutive quarter where the benchmark of 90% has not been met. The Q1 2025–26 result of 87.43% was a 0.87% decrease on the Q4 2024–25 result of 88.20%.

Q1 of 2020–21 was the last quarter when this benchmark was achieved (indicated in red in Figure 5).

Figure 5: Percentage of response to structure fire incidents within 7.7 minutes

Figure 5: Percentage of response to structure fire incidents within 7.7 minutes
  • Download 'Figure 5: Percentage of response to structure fire incidents within 7.7 minutes'

Updated