FRV: Percentage of response to structure fire incidents within 7.7 minutes (target 90%)
FRV’s result for this measure in Q2 in 2025–26 represents the 21st consecutive quarter where the benchmark of 90% has not been met. The result of 88% during this reporting period was, however, a 0.57% increase on the Q1 2025–26 result of 87.43%.
Q1 of 2020–21 was the last quarter when this benchmark was achieved (indicated in red in Figure 5).
Updated
