Fishermans Bend is Australia’s largest urban renewal precinct covering approximately 485 hectares in the heart of Melbourne. With an area twice the size of the CBD, Fishermans Bend consists of five distinct precincts across two municipalities – the City of Melbourne and the City of Port Phillip,and is set to create a vital link between Melbourne's CBD and the bay.
By 2050, Fishermans Bend is expected to be home to approximately 80,000 residents and provide employment for up to 80,000 people.
The Department of Transport and Planning (DTP) is leading the planning of the area. DTP is works closely with City of Melbourne and City of Port Phillip local governments, and engages with the community, landowners, stakeholders in planning and delivering on the vision to transform Fishermans Bend into a connected, liveable, prosperous, inclusive and sustainable place.
Produced in 2016 through extensive consultation, the Fishermans Bend Vision established a clear direction and benchmarks for future planning work and delivery, with a focus on environmental sustainability, liveability, connectivity, diversity and innovation.
The Fishermans Bend Team is currently completing the planning work and beginning the delivery of services and infrastructure for Fishermans Bend.
The Framework and planning controls (GC81) have been implemented in the planning schemes of the City of Port Phillip and the City of Melbourne.
The Framework will guide the transformation of Fishermans Bend, including the strategies for transport infrastructure, community infrastructure, public space, density, cultural historic heritage, activity centres and sustainability.
Development Activity is already underway, with development tracking ahead of growth estimates for 2026, and delivery of the first Tranche of DCP funded infrastructure is underway, complementing government investment in schools and the Fishermans Bend Innovation Precinct.
Fishermans Bend Growth Estimates
More recently, the transport related work (Integrated Transport Plan and Fishermans Bend Potential Future Train Tunnel), Fishermans Bend Urban Renewal Area Development Contributions Plan and Open Space Uplift, Montague Precinct Implementation Plan and the Draft Fishermans Bend Employment and Innovation Area Precinct Implementation Plan were released.
Visit the Fishermans Bend planning timeline page to learn more about the recent planning milestones.
Released in October 2018, the Framework is a long-term strategic plan for the development of Fishermans Bend to 2050. It will guide investment and development by the State Government, local governments and the private sector.
The Framework builds on the previously released Fishermans Bend Vision and has been prepared with input from the community, industry, key stakeholders and local councils.
It will guide the transition of Fishermans Bend into a connected, liveable, prosperous, inclusive, healthy and environmentally sustainable place.
The Framework provides direction on how the transition of the area will be managed, creating certainty for the community, landowners, developers, businesses and investors.
Feedback from public, landowners and industry engagement activities and submissions together with recommendations from an independent panel, have informed and shaped the Framework and the planning controls.
The Framework provides direction on the future development of Fishermans Bend. Key initiatives in the plans for Fisherman Bend include:
- Public transport including proposed future tram and train connections, major roads, bus and cycling links
- New primary and secondary schools, more open space and multi-purpose community hubs
- A 6 per cent affordable housing target by 2050 for all new development
- 80,000 jobs through additional commercial floor area and creation of high value jobs
- Leading sustainability targets including zero net greenhouse gas emissions and 80% of household waste to landfill
- Buildings over 5,000 square metres to be built to a 5 Star Green Star standard
- Strengthened overshadowing controls to protect public open space
- These controls and the Framework replace the Strategic Framework Plan and interim guidelines introduced in November 2016.
A suite of planning controls have been prepared to realise the objectives and strategies in the Framework. The planning controls sit within the Port Phillip and Melbourne Planning Schemes.
Key elements of the planning controls include:
- the introduction of a Dwelling Density Ratio
- a Social Housing Uplift scheme to deliver social housing
- height controls
- overshadowing controls to protect public open space
- building setback controls
- revised car parking controls and rates
- encouragement of dwelling diversity and a range of building types
- water storage and reuse across buildings
- requirement for all new buildings to meet a minimum 4 Star Green Star rating and large scale buildings to meet a 5 Star Green Star rating
- recognition of the role of existing industry in Fishermans Bend, while balancing the needs of future residents.
Please refer to the Planning Timeline for information on the latest planning controls and plans released for Fishermans Bend.
Since 2014, a number of projects within Fishermans Bend…...
These include:
- 1.5k new weekly bus services since 2022 on routes between Fishermans Bend and the City.
- $11 million road safety upgrades plus $1.5 million Road Safety Plan to support safe access to schools.
- Completed Planning for future rail tunnel.
- South Melbourne Primary School (2018)
- Port Melbourne Secondary School (2022)
- Narrarang Prmary School (2026)
- New “Kirrip” Community Park in Montague – a partnership between the Government and the City of Port Phillip (opened October 2018)
- Upgrades to improve passenger experience and accessibility for two tram stops on Routes 109 and 96 that services the Ferrars Street Community and Education Precinct
- Enhanced intersection at City Road and Ferrars Street – enabling increased accessibility and connectivity for pedestrians, cyclists and general traffic
- Purchase of the former General Motors Holden site to create the Fishermans Bend Innovation Precinct.
- $4.7m Gateway to GMH pilot project, the first step in Turner Street’s transformation
- The University of Melbourne is committed to the site. The potential future campus will feature world-class heavy engineering and large fabrication, testing and prototyping facilities, purpose-built for the Faculty of Engineering and Information Technology (FEIT) and the Faculty of Architecture, Building and Planning (ABP).
The Fishermans Bend Ministerial Advisory Committee operated from 2015-2018, comprising a panel of leading experts and community representatives to support development of the Framework
Read our engagement report here:
02_Volume_2_Community_Engagement_Report(opens in a new window)PDF 17.82 MBOur Documents page contains reports from the Ministerial Advisory Committee.
FAQ - Preferred rail route
In 2018, the Government released the Fishermans Bend Framework which identified two indicative potential heavy rail alignments through Fishermans Bend connecting the CBD to Melbourne’s West. Government has now determined a preferred heavy rail route that considers the future network need, existing technical constraints and live development proposals, where possible. The preferred heavy rail tunnel route and station locations in Fishermans Bend and Docklands align with the Fishermans Bend Integrated Transport Plan, with the project identified for potential delivery in Horizon 3 of the Plan.
The planning of the future rail route is a complex engineering task that requires consideration of soil conditions, tunnel design, construction methodology and land use opportunities and constraints. The refinement of the preferred route maximises certainty for delivery to the extent possible and importantly ensures that land use change can be planned around the rail corridor.
There will be no immediate impact to residents or existing businesses, unless development or redevelopment of their land within the future rail corridor is proposed. Government has further refined the preferred rail route through Fishermans Bend and Docklands to ensure greater confidence and understanding of the route and station locations.
The tunnel alignment is protected in planning controls through Amendment GC240 which introduces a Specific Control Overlay (SCO) and Incorporated Document to the City of Port Phillip, Melbourne and Port of Melbourne planning schemes. This Amendment was gazetted on 10th September 2026.
The preferred rail route is being protected to ensure that new developments in Fishermans Bend do not prejudice or constrain the design or delivery of the future train tunnel. As Victoria continues to grow it is important to plan for a second cross city rail tunnel, in addition to the Metro Tunnel, to unlock rail network capacity in growing parts of the State to the west and north-east. This future connection will help take pressure off our public transport network, boosting liveability and connectivity for all Victorians.
The permit requirements within the Incorporated Document apply in addition to other permit requirements in the relevant Planning Scheme.
Permit requirements are set out in the Incorporated Document. In general, a permit will be required to:
- Demolish any existing building that has foundations deeper than 4 metres below ground level.
- Construct any buildings that require foundations deeper than 4 metres below ground level.
Various exemptions to permit requirements are included in the Incorporated Document. The responsible authority (typically Council or the Minister for Planning) must refer any permit applications made under the Incorporated Document to Head, Transport for Victoria (Head, TfV). Officers from the Department of Transport and Planning (DTP) assess permit referrals on behalf of Head, TfV.
For further information on the permit and assessment process, see:
Information Sheet – Fishermans Bend Future Rail Infrastructure Protection (Nov 2026)(opens in a new window)PDF 136.82 KBThe requirements of the Incorporated Document apply to an application to amend a planning permit under Section 72 of the Planning and Environment Act 1987.
You can request a pre-application meeting if you have questions about the future rail infrastructure protection with DTP officers by emailing htfv.planning@transport.vic.gov.au. DTP strongly recommends that applicants seek pre-application advice.
FAQ – Fishermans Bend Urban Renewal Area Development Contributions Plan (DCP) and Open Space Uplift (OSU)
As new developments are built in Fishermans Bend, developers make contributions towards the infrastructure needed to support growth.
These contributions are collected by the State and invested in projects such as parks, roads, walking and cycling links, community facilities and drainage infrastructure.
The DCP sets out the projects that will be delivered, their priority and when they are expected to be built through to 2055.
This helps ensure infrastructure keeps pace with new homes, jobs and population growth.
A single, consolidated levy streamlines four separate charges, by incorporating into the capped development infrastructure levy charges for open space (replacing Clause 53.01 open space contributions), major drainage and flood mitigation infrastructure (replacing a separate charge by Melbourne Water), and some community infrastructure typically funded via a separate community infrastructure levy (replacing a separate community infrastructure levy).
Further detail on the development contributions charges is available here.
Since 2014, developer contributions in Fishermans Bend have been collected through interim arrangements.
The new DCP replaces those interim arrangements with a more comprehensive and transparent framework for funding and delivering infrastructure.
Importantly, this is not a new charge. The DCP consolidates existing contribution requirements into a single streamlined system that is easier to administer and coordinate.
Projects that have already received development approval can continue under the contribution arrangements that applied when they were approved.
The DCP will primarily apply to future development moving forward and provides certainty about infrastructure funding and delivery for the next stage of growth in Fishermans Bend.
The charge applies only to new development of dwellings or non-residential floorspace. It does not apply to existing or future businesses that operate in the precinct.
The DCP identifies 117 infrastructure projects that will help support current and future residents, workers and businesses in Fishermans Bend.
Projects include new and upgraded parks, safer roads and intersections, walking and cycling links, community facilities, public spaces, drainage improvements and transport-related infrastructure.
Examples of projects already being delivered through development contributions include:
- $10 million invested in Kirrip Park and surrounding streetscape works
- $11 million in road safety upgrades near local schools
Further projects are in planning stages. Work in kind agreements are also being negotiated with developers to deliver new public open space and road upgrades, as part of meeting theiier development contributions obligations.
These projects help create safer neighbourhoods, improve connections, support new housing and make Fishermans Bend a better place to live, work and do business.
No – the DCP will not apply to the EIA (formerly known as the NEIC).
The DCP applies to the Capital City Zoned areas of Fishermans Bend including Montague, Lorimer, Sandridge and Wirraway.
Montague Precinct Implementation Plan (MPIP)
The Montague Precinct Implementation Plan (MPIP) is the first detailed implementation plan prepared for a Fishermans Bend neighbourhood. It sets out the priority infrastructure projects needed to support Montague's growth over the next decade and provides a clear roadmap for how the precinct will transition towards its long-term vision for 2050.
The MPIP will help create a more liveable neighbourhood by guiding the design of new development as well as the delivery of parks, community facilities, safer and better-connected streets, and other essential infrastructure. It will support both current and future residents by ensuring investment is coordinated and aligned with the area's growth.
The MPIP identifies the infrastructure needed to support Montague's planned growth and provides greater certainty to residents, businesses and investors. This confidence is expected to support delivery of the targeted 10,300 homes in Montague by 2050, with more than half of that target already completed, under construction, approved or proposed.
Montague is one of five neighbourhoods that make up Fishermans Bend and is the first to receive a detailed implementation plan. Similar plans are being prepared for Lorimer, Sandridge, Wirraway and the Employment and Innovation Area, providing a coordinated approach to infrastructure delivery across Fishermans Bend.
Yes. A draft MPIP, known as "Making Montague", was released for a 12-week public consultation period that included community briefings, workshops and meetings with landowners. Feedback demonstrated strong support for the plan and helped inform the final MPIP, developed in collaboration with City of Port Phillip.
The MPIP and DCP work together to support Fishermans Bend's growth. The MPIP identifies the priority infrastructure needed in Montague, while the DCP establishes how major infrastructure projects across the urban renewal area will be funded and delivered over time as development occurs.
It’s proposed that State Government will work with local government, other state agencies and the development sector to progress the priority projects identified in the MPIP. Planning is also underway to complete detailed implementation plans for the remaining Fishermans Bend precincts during 2027.
Updated